Postmortem
Took a little longer to bring back up the connector for Global Secure Access. However the core came back up normally. Proxmox did some weird stuff. Solomon will write up a summary
Posted Oct 15, 2026 - 00:27 EDT
Completed
The scheduled maintenance has been completed.
Posted Oct 14, 2026 - 23:30 EDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Oct 14, 2026 - 23:00 EDT
Scheduled
We will be rebooting the main network switch at 11 pm tonight 10/14/2026. We are calling for a 30 minute maintenance window, but the outage will be less than 15 minutes. Brightspace will not be down during this time.
Posted Oct 14, 2026 - 17:24 EDT
This scheduled maintenance affected: Spring Arbor Campus (Internet Connectivity, Printing, Advancement Building Network, Andrews Hall Network, Apartment A Network, Apartment B Network, Apartment C Network, Apartment D Network, Apartment E Network, Apartment F Network, Apartment G Network, Apartment H Network, Art Building Network, CCS House Network, Dietzman Hall Network, Fieldhouse Network, Gainey Hall Network, HR House Network, K House's Networks, Lowell Hall Network, Marketing & Communication House Network, Outdoor Wireless, Poling Center Network, Sayre-DeCan Hall (SDH) Network, Smith Music Center (SMC), Soccer Complex Network, Student Center Network, Tennis Complex Network, Vallor House Network, Village A Network, Village B Network, Village C Network, Village D Network, Village E Network, Village F Network, Village G Network, Welcome Center Network, Whiteman-Gibbs Science Center (WG) Network, White Library Network, Campus Power).